A governmental delegation headed by Prime Minister Hussein Arnous started a visit to the Deir-ez-Zor province to inspect a number of service and development projects and their implementation rates.
Engineer Hussein Arnous inaugurated the temporary bridge linking the two banks of the Euphrates River, which was completed by national cadres.
The bridge extends for a distance of 220 meters and a width of 10 meters. It is designed for a load of approximately 100 tons, and loads of 70 tons were conducted experimentally.
The government delegation includes the ministers of local administration, environment, agriculture, agrarian reform, oil, mineral wealth, water resources, and education.
This article was edited by The Syrian Observer. The Syrian Observer has not verified the content of this story. Responsibility for the information and views set out in this article lies entirely with the author.